Global electrical power multiplication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899718
SERIAL NO

15237999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various examples are provided for global electrical power multiplication. In one example, a global power multiplier includes first and second guided surface waveguide probes separated by a distance equal to a quarter wavelength of a defined frequency and configured to launch synchronized guided surface waves along a surface of a lossy conducting medium at the defined frequency; and at least one excitation source configured to excite the first and second guided surface waveguide probes at the defined frequency, where the excitation of the second guided surface waveguide probe at the defined frequency is 90 degrees out of phase with respect to the excitation of the first guided surface waveguide probe. In another example, a method includes launching synchronized guided surface waves along a surface of a lossy conducting medium by exciting first and second guided surface waveguide probes to produce a traveling wave propagating along the surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUANTUM WAVE LLC414 CHURCH STREET SUITE 308 SANDPOINT ID 83864

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corum, James F Morgantown, US 142 1712
Corum, Kenneth L Plymouth, US 125 1428

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00