Production method of hole blocking layer, hole blocking layer, photoelectric conversion element, photoelectric conversion device, organic thin-film solar cell panel, and light-emitting device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899617
SERIAL NO

14195294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method of a hole blocking layer includes: a liquid layer forming step that causes a liquid composition and a surface of a member on which the hole blocking layer is to be formed, to contact with each other thereby forming a liquid layer comprising the liquid composition on the surface of the member on which the hole blocking layer is to be formed, the liquid composition containing a zinc source comprising bis(acetylacetonato)zinc, a complexing agent comprising acetylacetone, and a polar solvent; and a drying step that heats the liquid layer formed by the liquid layer forming step to vaporize the complexing agent and the polar solvent from the liquid layer thereby forming a hole blocking layer comprising zinc oxide on the surface of the member on which the hole blocking layer is to be formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IDEAL STAR INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuwabara, Takayuki Ishikawa, JP 2 5
Omote, Kenji Miyagi, JP 73 1271
Saida, Morihiko Miyagi, JP 4 12
Takahashi, Kohshin Ishikawa, JP 4 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00