Redistribution layer for substrate contacts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899465
SERIAL NO

14807259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure with an interconnection layer for redistribution of electrical connections includes a plurality of first electrical connections disposed on a substrate in a first arrangement. An insulating layer is disposed on the substrate over the first electrical connections. A plurality of second electrical connections is disposed on the insulating layer on a side of the insulating layer opposite the plurality of first electrical connections in a second arrangement. Each second electrical connection is electrically connected to a respective first electrical connection. An integrated circuit is disposed on the substrate and is electrically connected to the first electrical connections. The first electrical connections in the first arrangement have a greater spatial density than the second electrical connections in the second arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
X DISPLAY COMPANY TECHNOLOGY LIMITED6TH FLOOR 2 GRAND CANAL SQUARE DUBLIN D02 A342

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bower, Christopher Raleigh, US 139 8411
Cok, Ronald S Rochester, US 695 25064
Meitl, Matthew Durham, US 178 15827

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00