Molded leadframe substrate semiconductor package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899208
APP PUB NO 20110076805A1
SERIAL NO

12964698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for forming land grid array semiconductor packages includes a leadframe that is supported by a substrate comprising mold compound. In some embodiments, at least one die is electrically coupled to the leadframe by bondwires. The package comprises a second mold compound to act as an encapsulant. An apparatus for forming a land grid array semiconductor package includes means for molding a leadframe, assembling thereon at least one semiconductor device, applying a second mold, and singulating to form individual devices. A land grid array package comprises a leadframe, a substrate for supporting the leadframe, at least one semiconductor device and a mold compound.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTAC HEADQUARTERS PTE LTD22 ANG MO KIO INDUSTRIAL PARK 2 SINGAPORE 569506

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nondhasitthichai, Somchai Bangkok, TH 36 383
Sirinorakul, Saravuth Bangkok, TH 79 565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00