Gas intake device of magnetron sputtering vacuum chamber and magnetron sputtering apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9899192
SERIAL NO

14603527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas intake device of magnetron sputtering vacuum chamber and a magnetron sputtering apparatus with the gas intake device, the gas intake device of magnetron sputtering vacuum chamber comprises a gas mixing box configured to receive and mix the gas, a gas intake box configured to introduce the gas into a vacuum chamber, and a connecting pipe configured to connect with the two boxes, the gas mixing box has one or more gas intake pipes. The gas intake device can increase the distribution uniformity after the gas enters inside the vacuum chamber, effectively decrease the impact force to the precision equipment(s) in the vacuum chamber, and extend the service life of the apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTD100015 NO 10 JIUXIANQIAO ROAD BEIJING CHAOYANG DISTRICT BEIJING CITY BEIJING CITY 100015
HEFEI BOE DISPLAY LIGHTING CO LTDNO 2177 TONGLINGBEI ROAD HEFEI ANHUI 230012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Wenbo Beijing, CN 35 61
Zhang, Qiping Beijing, CN 23 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00