Hybrid binding of meshes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9898854
SERIAL NO

15186318

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure provides an approach for a hybrid binding of meshes. Multiple meshes having levels of detail appropriate for different regions of a model are topologically connected by binding them together at simulation time. In one embodiment, a simulation application creates both geometric and force bindings between vertices in meshes. The simulation application identifies embedded vertices of a first mesh to be bound to a second mesh as being “best” bound vertices, such as vertices coincident with vertices in the second mesh, and geometrically binds those vertices to appropriate vertices of the second mesh. The simulation application then binds each of the remaining embedded vertices which cannot be geometrically bound to vertices of the second mesh via a force binding, in which a zero-length spring force based technique is used to transfer forces and velocities between the force bound vertex of the first mesh and vertices of the second mesh.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIXAR1200 PARK AVENUE EMERYVILLE CA 94608

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kautzman, Ryan San Francisco, US 5 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00