Connection device and an apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9898050
SERIAL NO

14494064

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection device for an apparatus includes a first rotation shaft, a second rotation shaft, a synchronization bulk, and a guide bulk. The first rotation shaft includes a first synchronization section set with a first groove; the second rotation shaft is in parallel with the first rotation shaft and includes a second synchronization section set with a second groove. The synchronization bulk includes a first end, a second end disposed opposite the first end, and a position limitation section, with the first end being disposed within the first groove and capable of sliding within the first groove, the second end being disposed within the second groove and capable of sliding within the second groove; the guide bulk being set with a first containing groove, a second containing groove, and a guide groove containing groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LENOVO (BEIJING) CO LTD100085 NO 6 WEST ROAD BEIJING HAIDIAN DISTRICT BEIJING CITY BEIJING CITY 100085

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xu, Jun Beijing, CN 1004 7793

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00