Docking station and mobile terminal with the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9898044
SERIAL NO

15484262

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure provides a docking station and a mobile terminal with the docking station. The docking station includes a docking main body, a shelter, a first link mechanism, a second link mechanism and a moveable locking bar. The shelter shields the connector and the moveable locking bar is stayed in an unlocked position when the docking station is free. When the mobile terminal is coupled with the docking station, the first link mechanism is driven by the mobile terminal, the shelter is forced to rotate to a predetermined storage position, and the second link mechanism drives the moveable locking bar to a locked position to lock the mobile terminal. The docking station is easy to use with simple process of assembly and adjustment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTD66 CHUNG SHAN ROAD TU-CHENG NEW TAIPEI
NANNING FUGUI PRECISION INDUSTRIAL CO LTDNO 18 ZONGBU ROAD NANNING NEW HIGH-TECH INDUSTRIAL DEVELOPMENT ZONE NANNING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Ying-Jui New Taipei, TW 50 379

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00