Fractional bandgap reference voltage generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9898030
APP PUB NO 20180017986A1
SERIAL NO

15207732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reference voltage generator circuit includes a circuit that generates a complementary to absolute temperature (CTAT) voltage and a proportional to absolute temperature (PTAT) current. An output current circuit generates, from the PTAT current, a sink PTAT current sunk from a first node and a source PTAT current sourced to a second node, wherein the sink and source PTAT currents are equal. A resistor is directly connected between the first node and the second node. A divider circuit divides the CTAT voltage to generate a divided CTAT voltage applied to the first node. A voltage at the second node is a fractional bandgap reference voltage equal to a sum of the divided CTAT voltage and a voltage drop across the resistor that is proportional to a resistor current equal to the sink and source PTAT currents.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS INTERNATIONAL N VWTC SCHIPHOL AIRPORT SCHIPHOL BOULEVARD 265 1118BH SCHIPHOL AIRPORT AMSTERDAM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lahiri, Abhirup Delhi, IN 20 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00