Method, controller, and computer program product for controlling a voltage in a power grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897988
SERIAL NO

14871519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

For controlling a voltage in a power grid including a PV bus and a PQ bus, a first tolerance range for an active power of the PV bus and a second tolerance range for an active power of the PQ bus are received. A first value for a reactive power of the PQ bus is received. With that, a robust optimization process is run for a set of power flow equations. The first and second tolerance ranges and the first reactive power value are input to the robust optimization process using the first and second tolerance ranges as robust optimization uncertainty. With that, the robust optimization process determines a voltage set point for the PV bus so that the set of power flow equations is fulfilled for the first and second tolerance ranges. According to the determined voltage set point, a voltage at the PV bus is controlled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 80333 MÜNCHEN 80333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Münz, Ulrich München, DE 15 36
Sollacher, Rudolf Eching, DE 15 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00