Model predictive control with uncertainties

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897984
SERIAL NO

14451913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method controls a system for a multiple control steps according to the reference trajectory of a task of the operation to produce an actual trajectory of the system completing the task of the operation. For each control step, a control input to the system is determined using a model predictive control (MPC) having at least one parameter of uncertainty. The method determines a value of a learning cost function of a distance between the reference trajectory and the actual trajectory and determines, using a model free optimization, a value of the parameter of uncertainty reducing the value of the learning cost function. Next, the method determines a set of control inputs for completing the task according to the reference trajectory using the MPC with the updated parameter of uncertainty.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC RESEARCH LABORATORIES INC201 BROADWAY CAMBRIDGE MA 02139

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benosman, Mouhacine Boston, US 45 259
Di, Cairano Stefano Somerville, US 113 1064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00