Cluster analysis for selecting reservoir models from multiple geological realizations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897721
SERIAL NO

14904648

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computing device facilitates the organization of a plurality of three-dimensional geological data realizations into respective one-dimensional arrays of geological property values, with each geological property value corresponding to a three-dimensional grid location of a respective three-dimensional geological data realization. The computing device then facilitates the grouping of the one-dimensional arrays into two or more array clusters based on a comparison of geometric locations of the geological property values within the respective arrays, and selects at least one of the plurality of three-dimensional geological data realizations for each of the two or more array clusters. The selected data realizations are then provided at a user interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANDMARK GRAPHICS CORPORATION3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chambers, Richard L Yukon, US 17 72
Fei, Jin Houston, US 5 21
Shi, Genbao Sugar Land, US 30 101
Yarus, Jeffrey Marc Houston, US 31 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00