Apparatus for controlling the fuel supply of an internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897016
SERIAL NO

15037909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

On the basis of a decrease in a high-pressure detection value and a low-pressure detection value during fuel control using a CNG injector, an electronic control unit automatically switches the combustion control to combustion control using a gasoline injector even when the amount of CNG remaining is insufficient. When the first shutoff valve is forcibly switched to an closed state by inputting a forcible shutoff command of a first shutoff valve to a terminal and the combustion control using the CNG injector is performed, a switching process to the combustion control using the gasoline injector is inhibited regardless of the decrease in the high-pressure detection value and the low-pressure detection value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 4748588 ?4748588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Onishi, Akito Nagoya, JP 13 89
Shirasawa, Hirotaka Chita, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00