System and method for controlling a temperature of oil in a power-plant of a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896979
SERIAL NO

13032870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is provided for controlling a temperature of oil in a power-plant operable to propel a vehicle. The system includes a heat-exchanger arranged relative to the power-plant. The heat-exchanger is configured to receive the oil from the power-plant, modify the temperature of the oil, and return the modified temperature oil to the power-plant. The system also includes a valve configured to direct the oil through the heat-exchanger during a warm-up operation of the power-plant such that the temperature of the oil is increased. The valve is also configured to direct the oil to bypass the heat-exchanger during a low load operation of the power-plant such that the temperature of the oil is increased. Additionally, the valve is configured to direct the oil through the heat-exchanger during a high load operation of the power-plant such that the temperature of the oil is decreased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 M/C 482-C22-A68 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noonchester, Joseph J New Hudson, US 3 9
Pung, Jonathan Auburn Hills, US 4 29
Spix, Thomas A Rochester Hills, US 33 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00