Turbine vane with cooled fillet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896951
SERIAL NO

14662319

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure pertains to a vane comprising a platform and airfoil extending form said platform and connected to the platform by a fillet. An impingement tube is inserted into said airfoil delimiting a cooling channel between the impingement tube and the side walls. The vane further comprises a baffle structure positioned adjacent the fillet and which follows the inside contour of the fillet; delimiting a first cooling passage between the fillet and the baffle structure. A first obstruction is arranged on the inside of the airfoil at the connection of the fillet to the side walls for separating the first cooling passage from the cooling channel in the airfoil and to guide the cooling gas from the first cooling passage into the impingement tube. The disclosure further refers to a method for cooling such a vane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANSALDO ENERGIA SWITZERLAND AGROMERSTRASSE 36 BADEN 5401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Facchinetti, Emanuele Zurich, CH 5 29
Henze, Marc Wettingen, CH 6 26
Krueckels, Joerg Birmenstorf, CH 19 71
Wagner, Guillaume Lausanne, CH 4 20
Widmer, Marc Winterhur, CH 11 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00