Method for controlling a self-propelled construction machine to account for identified objects in a working direction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896810
SERIAL NO

14835481

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A self-propelled construction machine has an image capturing unit for capturing an image of the terrain, a display unit on which the captured image is displayed, and a data processing unit. In the displayed image, objects that are relevant to the building project, for example manhole covers, water inlets or curbs, are identified and a spatial data set containing information regarding the position of the identified objects in a reference system which is independent of the movement of the construction machine is determined from the image data of the capturing unit. The construction machine is then controlled in order to carry out translational and/or rotational movements on the terrain and/or to install a structure on the terrain or to alter the terrain on the basis of the spatial data set. As a result, the previously identified objects can be taken into account in the building project.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WIRTGEN GMBHREINHARD-WIRTGEN-STR 2 WINDHAGEN 53578

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barimani, Cyrus Konigswinter, DE 287 2592
Berning, Christian Zulpich, DE 166 1609
Fritz, Matthias Linz, DE 53 468

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00