Homogeneous polymerization process using evaporative cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896525
SERIAL NO

15083410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a continuous homogeneous solution phase polymerization process comprising contacting, in an evaporative reactor system at a temperature of 50° C. or more and a pressure of 100 kPa or more, a catalyst system, optionally, a hydrocarbon diluent, optionally, scavenger, and one or more monomer(s) to form a homogeneous polymerization medium, where the polymer product is dissolved in the reaction medium at 10 wt % or more (based upon the weight of the polymer present in the effluent at the exit of the reactor) and the catalyst system is dissolved in the reaction medium, and where the catalyst system comprises an activator and a coordination catalyst precursor compound and where all or part of the polymerization medium is evaporated during the polymerization.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL CHEMICAL PATENTS INC22777 SPRINGWOODS VILLAGE PKWY TECH & IP LAW SPRING TX 77389

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Friedersdorf, Christopher B Kingwood, US 3 1
Kiss, Gabor Hampton, US 82 1040
Lattner, James R LaPorte, US 158 1562

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00