Ziegler-Natta catalyst synthesis and process thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896523
SERIAL NO

15185019

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention describes a process of preparing a catalyst for olefin polymerization comprising: (i) treating a magnesium metal with an organohalide along with an internal donor to obtain a reaction mixture having solid component (A); (ii) treating the reaction mixture having solid component (A) with an acyl halide to obtain a reaction mixture having solid component (B); and (iii) treating the reaction mixture having solid component (B) of step (ii) with a transition metal compound to obtain the catalyst. The present invention also relates to a process for preparation of a catalyst system from said catalyst and preparation of a polyolefins from the catalyst system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDIAN OIL CORPORATION LIMITED400051 MUMBAI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bantu, Bhasker Faridabad, IN 13 25
Kapur, Gurpreet Singh Faridabad, IN 59 103
Kaur, Sukhdeep Faridabad, IN 22 26
Kumar, Naresh Faridabad, IN 128 592
Shashikant, null Faridabad, IN 9 22
Singh, Gurmeet Faridabad, IN 76 547

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00