Method for producing a composite body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9895852
SERIAL NO

14439688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a composite body and to a composite body produced using the method, wherein the composite body (10) is formed as a pressure pipe or as a pressure container, wherein the composite body is composed of a main body (13) that is made of steel and of a coat (14) that is made of a fiber composite (15), said coat enclosing the outside of the main body at least in some sections, wherein, for forming the fiber composite, a fibrous material is wound around the main body, wherein the fibrous material is impregnated with a resin before or after winding, wherein the wound and impregnated fibrous material is heated in order to form the fiber composite, wherein the method is carried out in situ on a built-in pressure pipe or pressure container, wherein the wound and impregnated fibrous material is heated to up to 700° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHUNK KOHLENSTOFFTECHNIK GMBH35452 HEUCHELHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berreth, Karl Leonberg, DE 3 13
Bischoff, Sandro Kasendorf, DE 1 1
Czychon, Karl-Heinz Weinheim, DE 1 1
Ebert, Marco Biebertal, DE 12 54
Eckardt, Christian Selb, DE 1 1
Henrich, Martin Wetzlar, DE 15 60
Krenkel, Walter Bayreuth, DE 18 224
Lauer, Andreas Kirchhain, DE 10 29
Maile, Karl Stuttgart, DE 2 5
Metzger, Klaus Neustadt/Weinbstrasse, DE 5 36
Scheibel, Thorsten Bad Nauheim, DE 13 57
Schmidt, Jens Bayreuth, DE 22 123
Spatz, Carolin Bindlach, DE 1 1
Weiβ, Roland Huettenberg, DE 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00