Molding apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9895835
SERIAL NO

14777632

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to achieve lower costs in a molding apparatus using a mold by reducing mold cleaning steps following releasing of the product from the mold and shortening the molding cycle, the apparatus is equipped with a plurality of fixed molds and movable molds which are heated to the temperature necessary to harden a molding material and come together by means of clamping to form a cavity, and a non-heated cold runner which supplies the molding material from an injection device to the interior of the cavity via a gate opened in the movable mold, the fixed molds and movable molds being movable between an injection stage where the injection device and cold runner (32) are present and an opening stage near the injection stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOK CORPORATION1-12-15 SHIBA DAIMON MINATO-KU TOKYO 1058585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koga, Shotaro Fujisawa, JP 9 21
Kurano, Yoshihiro Fujisawa, JP 29 201
Masaka, Takeshi Fujisawa, JP 9 25
Shimazoe, Toshihiro Fujisawa, JP 17 37
Urakawa, Tetsuya Fujisawa, JP 9 46
Watanabe, Shigeru Fujisawa, JP 150 1793

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00