Process for production of wood based materials from lignocellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9895824
SERIAL NO

14439768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for production of wood-base materials from lignocellulosic comminution product is disclosed. The wood-base materials are treated with at least one additive in the course of their production to reduce or diminish the emission of volatile organic compounds (VOCs) and, optionally, very volatile organic compounds (VVOCs), in particular terpenes and acids. The treatment is effected with one additive, being a porous carbon, like activated carbon. In another aspect, the present application is directed to the use of porous carbon, in particular, activated carbon, to reduce or diminish the emission of VOC, and optionally, VVOC, to reduce or diminish the emission of terpene and acids and aldehydes. Also, wood-base materials which are obtainable with the process or wood-based materials produced by using the additives mentioned above and which have reduced emission of VOCs, in particular terpenes and acids but also aldehydes are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWISS KRONO TEC AGLUZERN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borowka, Julia Zary, PL 2 14
Hasch, Joachim Berlin, DE 21 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00