Orthodontic bracket
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 20, 2018
Issued Date -
N/A
app pub date -
Dec 16, 2015
filing date -
Apr 19, 2006
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
An orthodontic bracket is described and which includes a base member defining an archwire slot having an opening, and at least one projection extending outwardly from the base member; a ligating slide moveable between a first position which is clear of the archwire slot, and second position where the ligating slide projects over the opening of the archwire slot; and a biasing member borne by the ligating slide, and resiliently cooperating with the projection, and wherein the biasing member has a first portion which receives the projection when the ligating slide is in the first position, and a second portion which receives the projection when the ligating slide is in the second position.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ORMCO CORPORATION | 1717 WEST COLLINS AVENUE ORANGE CA 92867 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Damon, Dwight H | Spokane, US | 24 | 615 |
# of filed Patents : 24 Total Citations : 615 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- A61C Class
- 38.79 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 20, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 20, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
