Device for processing crop residue into nutritional products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9894916
SERIAL NO

14277236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure device has a rifled barrel, a rifled end cap, a section clamped to the barrel, a circular flange welded to a threaded male pipe connection, a plate with holes or a cone, a female cap receiving the plate and aligning the holes to the rifling in the barrel, and the flange threadily engaging the cap, securing the plate. The rifled barrel provides shearing, increased pressure, and higher temperatures upon the passing crop residue. The increased surface area of the rifling grooves increases temperature and pressure between the crop residue and the barrel wall. The rifling, when misaligned, creates a pressure chamber that further breaks down the molecules in the crop residue. The crop residue then enters a popper device. The pressure in the popper device forces the crop residue through the holes of plate or around an encased cone, relieving excess pressure and producing a nutritional animal feed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AHEARN ROGER E2207 ENGLE CREEK RD BARNHART MO 63012
PETERFREUND LAURIE A11727 RUSSET MEADOW ST LOUIS MO 63146

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Madoyan, Roza Yerevan, AM 1 2
Sargsyan, Hakob Yerevan, AM 1 2
Tumagyan, Ashot Albuquerque, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00