Rotating electric machine having a cooling frame with a plurality of coolants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893593
SERIAL NO

14598794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotating electric machine includes a cooling frame. The cooling frame includes a flow passage through which the first liquid coolant circulates, a flow inlet connected to one end of the flow passage so as to make the first liquid coolant flow from the outside into the flow passage, and a flow outlet connected to the other end of the flow passage so as to make the first liquid coolant having flown through the flow passage flow to the outside. The machine is configured that, when the flow passage is divided into a front half portion closer to the flow inlet and a latter half portion closer to the flow outlet, the front half portion becomes a portion where the first liquid coolant mainly cools the second liquid coolant, and the latter half portion becomes a portion where the first liquid coolant mainly cools the gas coolant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI INDUSTRIAL PRODUCTS LTD5-1 SOTOKANDA 1-CHOME CHIYODA-KU TOKYO 1010021 ?1010021

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanazawa, Yuji Tokyo, JP 18 237
Kinoshita, Hirotaka Tokyo, JP 7 44
Kori, Daisuke Tokyo, JP 142 782
Sugimoto, Shinji Tokyo, JP 47 321

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00