Power supply apparatus, power supply system, and method for controlling power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893531
SERIAL NO

14358454

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system (101) includes a first power supply apparatus (111a) and a second power supply apparatus (111b) connected to a load in parallel, for supplying power to the load (115). The first supply apparatus (111a) includes a first controller that controls the output voltage of the first supply apparatus (111a) when a power supply from the first supply apparatus (111a) to the load 115 is equal to or greater than a power requirement by the load (115), and controls the output current of the first supply apparatus (111a) when the supplied power is less than the required power. The second power supply apparatus 111b includes a second controller that stops the second supply apparatus from supplying power (111b) when the power supply is equal to or greater than the power requirement, and controls the output voltage of the power supply apparatus (111b) when the power supply is less than the power requirement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA CORPORATION6 TAKEDA TOBADONO-CHO FUSHIMI-KU KYOTO-SHI KYOTO 612-8501

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Masahiro Kanagawa, JP 169 1537

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00