Coupling dynamics for power systems with iterative discrete decision making architectures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893529
SERIAL NO

15196961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various examples are provided that are related to coupling dynamics for, e.g., power systems with iterative discrete decision making architectures. In one example, a method includes determining an output power adjustment using a frequency difference associated with a generator of a first area of a power system and price signals corresponding to power generation in the first area and in a second area coupled to the first area by a tie-line; and providing a power command based upon the output power adjustment to a control system of the generator. In another example, a power system control system includes first and second agents configured to control power generation of a first area and a second area of a power system, respectively. The second agent can control power generation of the second area using frequency differences of generators in the second area and price signals of the first and second areas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF SOUTH FLORIDA3802 SPECTRUM BLVD SUITE 100 TAMPA FL 33612

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miao, Zhixin Tampa, US 16 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00