Solid electrolytic capacitor containing a pre-coat layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9892862
SERIAL NO

14266912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid electrolytic capacitor that contains an anode body formed from an electrically conductive powder, dielectric located over and/or within the anode body, an adhesion coating overlying the dielectric, and a solid electrolyte overlying the adhesion coating is provided. The powder has a high specific charge and in turn a relative dense packing configuration. Despite being formed from such a powder, the present inventors have discovered that the conductive polymer can be readily impregnated into the pores of the anode. This is accomplished, in part, through the use of a discontinuous precoat layer in the adhesion coating that overlies the dielectric. The precoat layer contains a plurality of discrete nanoprojections of a manganese oxide (e.g., manganese dioxide).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOCERA AVX COMPONENTS CORPORATIONONE AVX BOULEVARD FOUNTAIN INN SC 29644

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Kiyofumi Shiga Pref., JP 14 102
Inazawa, Koji Shiga Pref., JP 4 7
Noborio, Hiromasa Shiga Pref., JP 4 6
Tatsuno, Junya Shiga Pref., JP 3 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00