Process control apparatus and system, and method for determining normality thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891603
SERIAL NO

14336795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process control apparatus includes a hypervisor, a controller configured to run on the hypervisor and to communicate with a field apparatus to control an industrial process, an operation model definer configured to define an operation model, which is information establishing operation specifications derived from specifications of the controller, a trace information collector configured to collect traces of interactive motions between hardware and the controller, and a normality determiner configured to compare the operation model defined by the operation model definer with the information collected by the trace information collector and to determine the normality of the operation of the process control apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOKOGAWA ELECTRIC CORPORATIONTOKYO 180-8750

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohno, Takeshi Tokyo, JP 70 500
Tsuchiya, Masanobu Tokyo, JP 14 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00