Optical articles and methods for preparation of same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891349
SERIAL NO

15429352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a transparent, non-elastomeric optical article prepared by (1) combining to form a reaction mixture (a) a polyisocyanate component; and (b) an active hydrogen component including (b1) a first component free of amino groups including at least one first polyol; and (b2) a second component containing (i) a second polyol and/or a polythiol and (ii) a compound containing both amine and hydroxyl functional groups; (2) introducing the reaction mixture to a mold at a temperature and for a time sufficient to form a thermoset polymerizate; and (3) releasing the polymerizate from the mold to yield a transparent, non-elastomeric optical article. Also provided is a method for preparing a transparent optical film. Optical films and articles prepared by the methods also are provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PPG INDUSTRIES OHIO INC3800 WEST 143RD STREET CLEVELAND OH 44111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bojkova, Nina Vassileva Monroeville, US 3 36
Graham, Marvin Jerome Monroeville, US 3 36
Kryger, Matthew J Maplewood, US 29 43
Menta, Federico Milan, IT 14 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00