Partial discharge measurement method, partial discharge measurement device, and method of producing insulated wire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891263
SERIAL NO

15055325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A partial discharge measurement method includes: a moving step of moving an insulated wire including an insulating layer on a surface of the insulated wire; a voltage applying step of bringing an electrode which is connected to a power supply into contact with the insulating layer of the insulated wire which is moving, and applying a predetermined test voltage to the insulating layer while moving the insulated wire; a detection step of detecting, as a partial discharge signal, a signal which is more than or equal to a threshold value among signals involved in partial discharge events occurring from the insulating layer due to application of the predetermined test voltage; and a determination step of determining, based on a result in the detection step, frequency of occurrence of partial discharge events at the predetermined test voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI METALS LTD2-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8614

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanawa, Hidehito Tokyo, JP 9 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00