Quick gimbal connector and an aerial vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890900
SERIAL NO

15399095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A quick gimbal connector comprises: a first cylinder comprising a sliding slot on an inner wall of a first end of the first cylinder, at least one entrance provided at an end portion of the sliding slot, and a first boss provided on the first cylinder; a second cylinder coaxially and rotatably connected with the first cylinder; a connector; at least one rib provided on the connector; and a connecting plate fixedly connected with the second cylinder and being provided with a second boss. The at least one rib is configured to fit with the at least one entrance and can enter into and exit from the sliding slot via the at least one entrance when the first boss abuts against the second boss, such that the first cylinder and the connector can be locked or separated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SZ DJI OSMO TECHNOLOGY CO LTDNANSHAN DISTRICT SHENZHEN GUANGDONG 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Dahu Shenzhen, CN 11 180
Ren, Lixue Shenzhen, CN 6 33
Sun, Rongjian Shenzhen, CN 10 87
Zhao, Xifeng Shenzhen, CN 44 466

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00