Gaseous fuel supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890731
SERIAL NO

15033729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To exert combustion control using a CNG injector, a first cutoff valve is opened. On condition that the first cutoff valve is opened, the presence or absence of fuel leakage in a high-pressure side path is determined based on a drop in a detected value of a pressure in the high-pressure side path (high-pressure side detected value PH). Inserting a nozzle for CNG filling into a filling opening causes a phenomenon where the high-pressure side detected value PH rises once and then drops. If the high-pressure side detected value PH rises at a specified rate or more, a CPU stops determination as to the presence or absence of a fuel leakage malfunction for a specified period of time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 4748588 ?4748588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ariie, Takahiro Nisshin, JP 3 17
Onishi, Akito Nagoya, JP 13 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00