Modular building system with adhesive-joined spline connections between wall sections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890531
SERIAL NO

15094528

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular building system is provided which includes modular wall sections. Each wall section has a concrete support column reinforced within by metal rods and at least two wall panels which are formed of concrete. Spline panels are attached to the wall panels at one or both ends of each wall section to connect the wall section to an adjacent wall section. The spline panels are formed of concrete and have a width less than half a width of any of the wall panels. The spline panels are positioned so that a portion thereof extends further in a longitudinal direction of the wall section than the respective wall panels to which the spline panels are joined, so that the spline panels cover joints between wall panels of adjacent wall sections when the adjacent wall sections are connected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIBERMAN BARNET LNEW YORK NY 10014

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liberman, Aaron New York, US 1 7
Liberman, Barnet L New York, US 30 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00