Hydraulic drive system for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890518
SERIAL NO

14431062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

During boom-midair lowering operation in which a front work implement 130 can be turned under the self-weight of a boom 131, a hydraulic pump/motor 7 is operated as a motor to operate a generator/electric motor 10 as a generator. Power generation operation is performed by the hydraulic fluid discharged from a bottom-side chamber 5b of a boom cylinder 5 to recover positional energy. During jack-up in which the front work implement 130 cannot be turned under the self-weight of the boom 131, the generator/electric motor 10 is operated as an electric motor to operate the hydraulic pump/motor 7 as a pump. The jack-up is performed by supplying the hydraulic fluid from the bottom-side chamber 5b to rod-side chamber 5a of the boom cylinder 5 without supplying the hydraulic fluid from the main pump 2 to the rod-side chamber 5a of the boom cylinder 5.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikawa, Kouji Kasumigaura, JP 159 1336
Nakamura, Tsuyoshi Tsuchiura, JP 257 1982
Sato, Kensuke Ushiku, JP 37 352

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00