Process for unitary graphene layer or graphene single crystal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890469
SERIAL NO

15354706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A unitary graphene layer or graphene single crystal containing closely packed and chemically bonded parallel graphene planes having an inter-graphene plane spacing of 0.335 to 0.40 nm and an oxygen content of 0.01% to 10% by weight, which unitary graphene layer or graphene single crystal is obtained from heat-treating a graphene oxide gel at a temperature higher than 100° C., wherein the average mis-orientation angle between two graphene planes is less than 10 degrees, more typically less than 5 degrees. The molecules in the graphene oxide gel, upon drying and heat-treating, are chemically interconnected and integrated into a unitary graphene entity containing no discrete graphite flake or graphene platelet. This graphene monolith exhibits a combination of exceptional thermal conductivity, electrical conductivity, mechanical strength, surface smoothness, surface hardness, and scratch resistance unmatched by any thin-film material of comparable thickness range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GLOBAL GRAPHENE GROUP INC1240 MCCOOK AVENUE DAYTON OH 45404

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Bor Z Centerville, US 686 16010
Xiong, Wei Kettering, US 392 2700
Zhamu, Aruna Springboro, US 526 12868

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00