Chemical conversion coated plated steel sheet and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890461
SERIAL NO

14922341

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a chemically treated zinc-based plated steel sheet that is superior in weather resistance, water resistance, blackening resistance and film adhesion. A chemical conversion film having a thickness 0.5-10 μm is formed by coating and drying a chemical treatment solution on a surface of an aluminum-containing zinc-based alloy plated steel sheet. The chemical treatment solution contains a fluororesin containing 0.05-5% by weight of a hydrophilic functional group selected from the group consisting of a carboxyl group and a sulfonic acid group and 7-20% by weight of a fluorine atom, the fluororesin in which a number-average molecular weight is 1,000-2,000,000, and an oxoate, a fluoride, a hydroxide, an organic salt, a carbonate or a peroxygenated salt of a group 4A metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSHIN STEEL CO LTDCHIYODA-KU TOKYO 100-8366

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuno, Masanori Sakai, JP 19 75
Taketsu, Hirofumi Sakai, JP 19 54
Ueda, Koichiro Ichikawa, JP 46 416
Yamamoto, Masaya Sakai, JP 304 4288

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00