Method of manufacturing semiconductor device, substrate processing apparatus, and recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890458
SERIAL NO

14628963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A technique includes forming a film containing a first element, a second element, and carbon on a substrate by performing a cycle a predetermined number of times. The cycle includes non-simultaneously performing: forming a first solid layer containing the first element and carbon, and having a thickness of more than one atomic layer and equal to or less than several atomic layers, by supplying a precursor gas having a chemical bond of the first element and carbon to the substrate and confining the precursor gas within the process chamber, under a condition in which the precursor gas is autolyzed and at least a part of the chemical bond of the first element and carbon is maintained without being broken; and forming a second solid layer by supplying a reaction gas containing the second element to the substrate to modify the first solid layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOKUSAI ELECTRIC CORPORATION3-4 KANDAKAJI-CHO CHIYODA-KU TOKYO 1010045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirose, Yoshiro Toyama, JP 166 5866
Shimamoto, Satoshi Toyama, JP 53 2155
Yamamoto, Ryuji Kodaira, JP 108 1484

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00