Modification of fructan biosynthesis, increasing plant biomass, and enhancing productivity of biochemical pathways in a plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890387
SERIAL NO

13063992

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to the modification of fructan biosynthesis in plants and, more particularly, to methods of manipulating fructan biosynthesis in photosynthetic cells, and to related nucleic acids and constructs. The present invention also relates to increasing plant biomass and, more particularly, to methods of enhancing biomass yield and/or yield stability, including shoot and/or root growth in a plant, and to related nucleic acids and constructs. The present invention also relates to methods of enhancing the productivity of biochemical pathways and, more particularly, to fusion proteins in plants, and to related nucleic acids and constructs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGRICULTURE VICTORIA SERVICES PTY LTD475 MICKLEHAM ROAD ATTWOOD VICTORIA 3049

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Griffith, Megan Elizabeth Templestowe, AU 3 8
Martelotto, Luciano Gaston Elwood, AU 1 0
Mouradov, Aidyn Mill Park, AU 19 38
Spangenberg, German Bundoora, AU 53 470

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00