Persistent vortex generating high regression rate solid fuel grain for a hybrid rocket engine and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9890091
SERIAL NO

15262661

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additively manufactured solid fuel grain for a hybrid rocket engine having a cylindrical shape, defining a center combustion port and comprising a stack of fused layers of polymeric material suitable for hybrid rocket fuel. Each layer is formed as a plurality of fused abutting concentric beads of solidified material arrayed around the center port. An oxidizer is introduced into the solid fuel grain through the center port, with combustion occurring along the exposed surface area of the solid fuel grain center port wall. Each concentric bead possesses a surface pattern that increases the combustion surface area and when stacked forms a rifling pattern of undulations that induces oxidizer-fuel gas axial flow to improve combustion efficiency. The port wall surface pattern persists during the rocket engine's operation as the fuel phase changes from solid to gas and is ablated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIREHAWK AEROSPACE INC1420 CENTURY DRIVE CARROLLTON TX 75006

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jones, Ronald D Indialantic, US 26 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00