Aircraft airframe assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9889949
SERIAL NO

15305029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing an assembly tool (60) for assembling an assembly (6), the method comprising: providing at least a portion of a jig frame (62); fixing support plates (65) to the jig frame (62); machining the one or more support plates (65) such that a surface of each of the support plates (65) lies in a common plane (130); positioning the jig frame (62) such that the machined surfaces of the support plates (65) contact with a supporting surface (138); fixing pickup device mounting plates (140a, 140b) to the jig frame (62); machining, with respect to the supporting surface (138), the pickup device mounting plates (140a, 140b) such that a surface of each mounting plate (140a, 40b) has a respective predetermined position and orientation with respect to the supporting surface (138); and fixing, to the machined surfaces of the mounting plates (140a, 140b), a respective pickup device (66-72).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAE SYSTEMS PLC6 CARLTON GARDENS LONDON SW1Y 5AD UNITED KINGDOM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cookson, Andrew Peter Balderstone, GB 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00