Method and apparatus for determining the voltage at the electrodes of a spot welding gun

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9889520
SERIAL NO

13319763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and an apparatus for determining the temporal curve of the voltage (ue(t)) at the electrodes (3) of a spot welding gun (1) during a spot welding process as an indicator of the welding quality, wherein the electrodes (3) are fastened to gun arms (2) that can be moved relative to each other are provided. The apparatus includes a device (9) for measuring a measuring voltage (um(t)) between the electrodes (3), that measuring device (9) being connected to measuring leads (6) extending along the gun arms (2), and further includes a compensating coil (7) for measuring a compensating voltage (uk(t)) for compensating measuring errors within measuring leads. In order to determine the temporal curve of the voltage (ue(t)) at the electrodes (3) of the spot welding gun (1) during a spot welding process as precisely as possible, the device (9) for measuring the measuring voltage (um(t)) and the device (10) for measuring the compensating voltage (uk(t)) are designed as separate units for separate detection and are connected to a device (11) for processing the detected values.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRONIUS INTERNATIONAL GMBHFRONIUSSTRASSE 1 4643 PETTENBACH AUSTRIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ennsbrunner, Helmut Leonding, AT 13 19
Gschmeidler, Thomas Scharnstein, AT 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00