Ceria zirconia alumina composition with enhanced thermal stability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9889428
SERIAL NO

13549020

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the preparation of a calcined mixed oxide comprising Al-, Ce- and Zr-oxides, comprising the steps of providing an aqueous slurry comprising hydroxides of cerium and zirconium, contacting the hydroxides of cerium and zirconium with an alumina precursor to obtain an aqueous suspension of solids, isolating the solids from the aqueous suspension and drying to obtain a solid composition, calcining the solid composition of step (c) at a temperature from 450° C. to 1200° C. for at least 1 hour to obtain a calcined mixed oxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SASOL GERMANY GMBHANCKELMANNSPLATZ 1 HAMBURG 20537
TREIBACHER INDUSTRIE AGAUER VON WELSBACH-STRASSE 1 9330 TREIBACH-ALTHOFEN 9330

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alber, Frank Hamburg, DE 2 11
Dallmann, Kai Brunsbüttel, DE 3 14
Glöckler, Reiner St. Michaelisdonn, DE 4 12
Rolfs, Sönke Itzehoe, DE 1 10
Sagar, Amod Althofen, AT 8 42
Schöneborn, Marcos Hamburg, DE 3 12
Schermanz, Karl Launsdorf, AT 18 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00