Multi-stage amplifier with improved operating efficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887674
SERIAL NO

15232422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-stage amplifier, comprising a first amplifier stage is presented. The output of the first amplifier stage is coupled to a first terminal of a capacitor having a controllable capacitance. The input of a second amplifier stage is coupled to the output of the first amplifier stage and the first terminal of the capacitor. The output of the second amplifier stage is coupled to a second terminal of the capacitor and an output of the multi-stage amplifier. The input of a current sensing circuit is coupled with the output of the multi-stage amplifier. A control signal generator is coupled between the output of the current sensing circuit and a control terminal of the capacitor. The control signal generator provides a control signal to the capacitor in order to control or vary the capacitance of the capacitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIALOG SEMICONDUCTOR (UK) LIMITEDTOWER BRIDGE HOUSE ST KATHARINE'S WAY LONDON E1W 1AA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhattad, Ambreesh Swindon, GB 54 304
Kronmueller, Frank Neudenau, DE 47 255
Ramos, Carlos Zamarreno Munich, DE 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00