Board connector assembly, receptacle connector and plug connector thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887473
SERIAL NO

15201785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A board connector assembly has a receptacle connector and a plug connector. The receptacle connector has a first insulative housing, two sets of first terminals and two first metal reinforcing members mounted respectively on two opposite ends of the first insulative housing. The plug connector is detachably engaged with the receptacle connector and has a second insulative housing, two sets of second terminals and two second metal reinforcing members mounted respectively on two opposite ends of the second insulative housing. The first and second metal reinforcing members enhance structural strength and durability of the receptacle connector and the plug connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED-CONNECTEK INCNO 2 ALLEY 9 LANE 45 PAO-HSIN RD HSIN-TIEN NEW TAIPEI CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Kuo-Ching New Taipei, TW 26 279
Men, Wen-Liang New Taipei, TW 2 22
Meng, Ta-Teh New Taipei, TW 36 224
Shi, Mei New Taipei, TW 27 148
Yang, Sheng-Ho New Taipei, TW 32 433
Yu, Cheng-Feng New Taipei, TW 12 114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00