Semiconductor device manufacturing method, semiconductor device, and wire bonding apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887174
APP PUB NO 20160358880A1
SERIAL NO

15239849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device manufacturing method includes: raising and moving a bonding tool, while paying out a wire, in a direction from a second toward a first bonding point to form in the wire a cut portion bent in a vicinity of the second bonding point; lowering and moving a tip of the bonding tool to the cut portion; lowering the bonding tool vertically to thin the cut portion; raising the bonding tool while paying out the wire; and moving the bonding tool in a direction away from the first and second bonding points and along a wire direction connecting the first and second bonding points and then cutting the wire at the cut portion to form a wire tail. This allows the length of the wire tail to be adjusted easily and efficiently to be constant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHINKAWA LTDJAPAN TOKYO MUSASHIMURAYAMA FLAT TWO CHOME 51 TO 1 TOKYO TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sekine, Naoki Tokyo, JP 28 144

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00