Method for producing a composite structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887124
SERIAL NO

14900257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the manufacture of a composite structure includes the following stages: a) providing a donor substrate comprising a first surface and a support substrate; b) forming a zone of weakening in the donor substrate, the zone of weakening delimiting, with the first surface of the donor substrate, a working layer; c) assembling the support substrate and the donor substrate; d) fracturing the donor substrate along the zone of weakening; and e) thinning the working layer so as to form a thinned working layer. Stage b) is carried out so that the working layer exhibits a thickness profile appropriate for compensating for the nonuniformity in consumption of the working layer during stage e).

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOITECFRENCH BOERNING

International Classification(s)

loading....
  • 2014 Application Filing Year
  • H01L Class
  • 23828 Applications Filed
  • 21803 Patents Issued To-Date
  • 91.51 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2014201520162017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Mohamed Nadia Echirolles, FR 36 131
Maze, Eric Grenoble, FR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • H01L Class
  • 0 % this patent is cited more than
  • 7 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges3689997611243481558461392216162801 - 1011 - 2021 - 3031 - 4041 - 5051 - 6061 - 7071 - 8081 - 9091 - 100100 +05001000150020002500300035004000450050005500600065007000750080008500900095001000010500

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029