Electrostatic chuck and semiconductor-liquid crystal manufacturing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887117
SERIAL NO

14707322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrostatic chuck includes a base plate including a penetration hole, a placing table arranged on the base plate, and including an electrode at a position corresponding to the penetration hole, a first cylindrical insulating component arranged on an upper side inside the penetration hole of the base plate, a second cylindrical insulating component arranged on the first cylindrical insulating component, a third cylindrical insulating component arranged under the first cylindrical insulating component, and having an inner diameter smaller than an inner diameter of the first cylindrical insulating component, a connector arranged in the penetration hole, a cylindrical member included in the connector, and including an elastic body in an inner part, and a power feeding terminal included in the connector, and connected to the elastic body. The power feeding terminal touches the electrode of the placing table.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHINKO ELECTRIC INDUSTRIES CO LTDNAGANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katayama, Yoshifumi Nagano, JP 18 314
Kawai, Jiro Nagano, JP 5 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00