Semiconductor and other materials by thermal neutron transmutation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887087
SERIAL NO

14325647

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing p-n junction in semiconductor material such that small dimensions of such junctions are maintained, and associated lattice dislocations of such junctions may be preferentially maintained, and devices with such patterned semiconductor material, is disclosed. Typically, a neutron moderator is used to slow fast neutrons to thermal energies. A mask made from thermal neutron absorbing material, such as cadmium, is placed in close proximity to such neutron moderator. Thermal neutron focusing optics, such as compound refractive lenses, are used to collect and focus thermal neutrons emitted from the mask such that the pattern or portion of the pattern is transferred to the silicon body, with neutrons transmitted from the window areas in the mask and through the neutron optic so as to form the donor dopant concentration for the n-type regions by transmutation of silicon atoms into phosphorus. An electronic device produced by such a method has vertical p-n junctions continuous between both major surfaces and horizontal alternating p-type and n-type regions across most of the face of the material, such that unique properties are achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FULLER MICHAEL KEITHSALINAS CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuller, Michael Keith Salinas, US 4 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00