Method of fabricating a relay

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9887056
SERIAL NO

15145691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a relay for an electric vehicle and a method of manufacturing the same, and more particularly, a relay for an electric vehicle where a permanent magnet is integrally formed with a housing formed of a ceramic chamber, and a method of manufacturing the same. The relay, capable of rapidly executing current interruption includes: a fixed contact; a movable contact formed to contact or to be separated from the fixed contact; a shaft connected to the movable contact, and configured to move the movable contact; a housing configured to accommodate therein the fixed contact and the movable contact; an actuator configured to drive the shaft; and a permanent magnet integrally formed with the housing, and configured to extend an arc generated between the fixed contact and the movable contact. The permanent magnet includes an alnico-based material or a neodymium-based material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LSIS CO LTDANYANG-SI GYEONGGI-DO 14119

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Kwangsik Anyang-si, KR 8 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00