Method for predicting symmetric, automated, real-time ARC flash energy within a real-time monitoring system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9886535
SERIAL NO

15089922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for making real-time predictions about an arc flash event on an electrical system are disclosed. An analytics server is communicatively connected to a data acquisition component. The analytics server comprises a virtual system modeling engine configured to create a virtual system model reflecting current network topology of the electrical system; an analytics engine configured to monitor predicted output data from the virtual system model and real-time output data from the electrical system acquired by the data acquisition component and update the virtual system model when a difference between the real-time output data and the predicted output data exceeds a threshold; and an arc flash simulation engine configured to forecast at least one aspect of and arc flash event based on the virtual system model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BENTLEY SYSTEMS INCORPORATED685 STOCKTON DRIVE EXTON PA 19341

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meagher, Kevin Raleigh, US 34 1251
Radibratovic, Branislav San Diego, US 20 305

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00